Sectors · Civil contractors

Your programme doesn't wait for a redrawn plan.

On a live civil job, traffic documentation is either keeping the works moving or holding them up. Staging changes mid-project. A barrier design comes back marked up. An ROL sits with the TMC while your crew stands down. Sightline works to the pace of a construction programme, not a consultancy calendar.

SHT 01

What contractors come to us for

  • Staging sets that hold up when the job changesmultiple, evolving TGS coordinated as one sequence, revised and reissued as conditions move

  • Barrier design statementsdeflection zones assessed against the manufacturer's specification and the road authority's requirements, with approved-product status confirmed for the project

  • Multi-stage CTMPswhere each phase has its own arrangement, barriers, pedestrian routes and vehicle access, documented so the handover between stages is unambiguous on site

  • Site audits before someone else does onea compliance check against the approved plan, on your terms rather than the principal contractor's

  • ROL and permit managementrun in parallel with the design work so approvals aren't the reason a start date moves

Our engineers and project managers are qualified across a wide range of traffic and roadwork scenarios, and advise with practicality in mind — so the plan holds up when it actually meets the job.

SHT 02

Where contractors usually start

Route to the pages you need
Civil Contractors

Send us the drawings. We'll tell you what you need.


What to send
1. Site address
2. Staging or civil drawings
3. The programme pressure point
Sightline Traffic EngineersContact
1800 008 782
plans@sightlinetraffic.com.au
9 Epic Pl, Villawood NSW
Mon–Fri, 8am–5pm
ABN 16 699 960 668