Fifty small jobs is not one big job.
Utility works are a different problem to a single construction site. High volume, short notice, spread across multiple council areas, often near signals or on regional roads, and sometimes emergency. What matters isn't the complexity of any one TGS — it's turnaround and consistency across all of them.
What utility clients come to us for
Volume TGS turnaround — straightforward closures designed and issued quickly, to a consistent standard across every job
ROLs where works sit near a traffic light or on a state or regional road — managed end to end, including liaison with bus operators, the TMC, transport authorities and rail operators
Permits across multiple council jurisdictions — identifying which permit applies where, and lodging complete applications so processing time isn't lost to resubmission
TMPs for programmed works — where a rolling programme needs one governing plan rather than a document per site
Where utility clients usually start
Route to the pages you needHow a sector enquiry becomes a defined scope
From enquiry to controlled issue- Step 01Send the project
Provide the site, available drawings and the issue that needs resolving.
- Step 02Confirm the scope
We identify the required assessment, documentation, programme and fee.
- Step 03Assess and coordinate
The technical work is developed against the project and authority requirements.
- Step 04Check and issue
The agreed review is completed before controlled issue and support through comments.
Send us the drawings. We'll tell you what you need.
2. Typical site types
3. Council areas covered
plans@sightlinetraffic.com.au
Suite 413, 388 George St, Sydney NSW 2000
Mon–Fri, 8am–5pm
ABN 16 699 960 668